Henan Mine Crane rail-mounted gantry crane installed for international inland-port container handling.
International inland ports need reliable container-handling equipment that can support rail logistics, truck transfer and yard stacking without creating bottlenecks at the crane block.
Henan Mine Crane supplied a customized rail-mounted container gantry crane to the Dongfanghong (Luoyang) International Inland Port. According to the original project report, the crane uses variable-frequency speed control, a Siemens PLC system, anti-sway control, a ring trolley hoisting mechanism and an interchangeable upper/lower-frame spreader arrangement.
An inland-port RMG has to combine heavy repetitive duty with accurate handling over rail tracks and container stacks. The project layout may include different handling positions and cargo requirements, making trolley arrangement and spreader flexibility important.
For procurement, the crane should be specified together with the block layout: rail tracks, truck lanes, stack width, lifting height, runway length, container sizes and expected throughput.
The Luoyang project uses full variable-frequency control and Siemens PLC for smooth crane motion and coordinated operating logic. Anti-sway control supports more accurate container handling by reducing oscillation during transfer.
A ring trolley is used as the hoisting mechanism to adapt to the project's complex lifting positions. The upper/lower-frame spreader structure enables spreader interchangeability so the inland port can respond to different handling requirements.
For similar projects, Henan Mine Crane can adapt the RMG structure, trolley, spreader, control system and safety functions to the terminal's rail and yard geometry.
| Recommended Crane | Rail-Mounted Gantry Crane (RMG) |
| Referenced Capacity Marking | 40.5t shown on project crane |
| Control System | VFD speed control + Siemens PLC |
| Hoisting Mechanism | Ring trolley |
| Handling Features | Anti-sway + interchangeable upper/lower-frame spreader |
Night installation and assembly work for the rail-mounted container gantry crane at the inland-port project. |
Main girder and leg structure of the 40.5t-class RMG crane during project installation. |
Variable-frequency motion helps reduce abrupt acceleration during repetitive container transfer.
PLC control coordinates crane functions and can support project-specific operating logic.
Reduces container oscillation and helps improve positioning at rail and truck interfaces.
Selected in the referenced project to accommodate complex lifting positions.
Allows the lifting system to adapt to different handling tasks when required.
| International Inland Ports | Container handling serving cross-border rail and domestic logistics routes. |
| Rail Freight Terminals | Loading and unloading containers to and from trains. |
| Container Storage Blocks | Fixed-rail stacking and retrieval in permanent yard layouts. |
| Intermodal Hubs | Transfer between railway, road transport and storage areas. |
RMG cranes are effective for permanent container blocks where rail-guided travel, high utilization and repeatable stacking are priorities.
It allows the crane to adapt the lifting interface to different container or cargo-handling requirements without replacing the whole crane.
Provide rated capacity, container sizes, span, lifting height, rail gauge, runway length, stack layout, truck lanes, target throughput, power supply and required control functions.
Send your load data, yard or warehouse layout, handling cycle, operating environment and automation requirements. Henan Mine Crane engineers will review the application and prepare a project-specific crane proposal.