Home > cases > Port Crane Projects > Shipyard & Marine Handling

case

Review shipyard and marine crane projects for vessel construction, repair, dockside lifting and marine equipment handling in corrosive environments.
1000t Heavy-Duty Gantry Cranes for Wharf Construction Project
August 11, 2026

1000t Heavy-Duty Gantry Cranes for Wharf Construction Project

Henan Mine Crane manufactured and dispatched two 1000t gantry cranes for the project. Each crane combines very high lifting capacity with a high-strength steel structure and an intelligent control system designed for stable, safe and efficient operation.

Read More
40t Rail-Mounted Portal Crane Project for Port Cargo Handling

40t Rail-Mounted Portal Crane Project for Port Cargo Handling

Henan Mine Crane developed and manufactured a 40t rail-mounted portal crane for this application. Its lifting, slewing, luffing and travelling mechanisms allow the operator to approach cargo from different positions, transfer it across the operating area and place it accurately at the selected loading or storage point.

Read More
500t Double-Trolley Overhead Crane for Offshore Wind Manufacturing Project
August 10, 2026

500t Double-Trolley Overhead Crane for Offshore Wind Manufacturing Project

This offshore wind manufacturing project required a heavy lifting system for large nacelles, generators, mainframes, production fixtures and other high-value wind turbine components. The components move through unloading, assembly, turning, transfer and installation processes inside a large production workshop.

Read More
260/260+100/20t Offshore Wind Assembly Crane Fleet Project

260/260+100/20t Offshore Wind Assembly Crane Fleet Project

At a major offshore wind-turbine assembly base, dozens of Henan Mine Crane units support heavy component handling across production, assembly and maintenance areas. The installed fleet includes a 260/260+100/20t-marked heavy-duty overhead crane configuration for large synchronized lifts.

Read More
750t Industrial Gantry Crane Project in Zhejiang

750t Industrial Gantry Crane Project in Zhejiang

Henan Mine Crane manufactured a 750t double-girder gantry crane for a large industrial project in Zhejiang. The crane operates in a waterfront work area where ultra-heavy components must be lifted, transferred and positioned across a dedicated runway.

Read More
Steel Caisson Gantry Crane Supplier | Bridge Project Case
August 9, 2026

Steel Caisson Gantry Crane Supplier | Bridge Project Case

Large river-bridge foundations can use steel caissons that are excavated internally while sinking toward their design elevation. This is not a conventional lifting-only application. The crane system must work around the caisson structure

Read More
Cruise Ship Assembly Crane Package | 12-Crane Case

Cruise Ship Assembly Crane Package | 12-Crane Case

A large cruise ship is not assembled in one continuous lifting operation. Steel structures, subassemblies, equipment and outfitting materials move through different production zones before final integration

Read More
300t Bridge Construction Overhead Crane | Project Case

300t Bridge Construction Overhead Crane | Project Case

Bridge steel fabrication moves large structural sections between welding, machining, inspection and trial-assembly positions. Loads must travel efficiently across the production area, then approach fixtures and mating points at controlled low speed.

Read More
700t Bridge Construction Gantry Crane | Project Case

700t Bridge Construction Gantry Crane | Project Case

Steel-tower fabrication and pre-assembly require large structural sections to be lifted from production areas, transferred across the yard and positioned for fitting or erection preparation

Read More

ContactUsNowWithOurEnquiryForm

info@hnksglobal.com
18836207779
+8618836207779
xxxxxxxxxxxxxxxxxxx
Made for Pleasure !

    X