Henan Mine Crane 120t bridge crane lifting major generating-unit equipment during thermal power plant construction.
Thermal power projects require dependable turbine-hall cranes for installation and later maintenance of generators, turbines and other major equipment. For EPC contractors and plant owners, the crane must arrive on schedule, fit the turbine-building geometry and provide stable, accurate lifting during unit erection.
Henan Mine Crane supplied two 120t new-type double-girder overhead cranes for a thermal power project in Morowali, Central Sulawesi, Indonesia. The cranes supported installation of three 380 MW supercritical, once-reheat condensing coal-fired generating units.
Power-plant crane procurement must be coordinated with civil construction, turbine-generator delivery and erection sequencing. Span, hook approach, lifting height and runway loads affect both the crane and the turbine-hall building.
After commissioning, the same crane often remains a key maintenance asset, so accessibility, spare parts, inspection and long-term reliability should be considered during initial procurement rather than only during construction.
The referenced project uses two 120t new-type double-girder overhead cranes. The source project emphasizes safe and reliable operation, smooth travel and accurate positioning during installation of the three generating units.
For a similar thermal-power project, Henan Mine Crane can configure capacity, span, lifting height, main and auxiliary hooks, speeds and maintenance access from the turbine-generator erection plan and workshop drawings.
The project scope can also coordinate manufacturing and delivery batches with the buyer's international construction schedule.
| Recommended Crane | 120t Double-Girder Overhead Crane |
| Referenced Quantity | 2 crane sets |
| Power Project | 3 × 380 MW generating units |
| Application | Turbine-generator installation and power-plant maintenance |
| Design Focus | Safe operation, smooth travel, accurate positioning and project delivery coordination |
Heavy turbine-generation equipment being positioned beneath the power-station overhead crane. |
Project view of heavy turbine equipment being lifted inside the power-station construction area. |
Site team coordinating accurate placement of a large generating-unit component during construction. |
The referenced cranes support installation of major generating-unit equipment.
Double-girder construction provides the stiffness and trolley arrangement needed for heavy turbine-hall work.
Controlled movement helps protect high-value equipment during installation.
Precise crane and trolley movement supports alignment during generator and turbine assembly.
Manufacturing and shipment can be coordinated with overseas EPC construction milestones.
| Thermal Power Turbine Halls | Installation of generator and turbine components. |
| Power Plant Construction | Heavy equipment erection during new-unit construction. |
| Generator Maintenance | Rotor, stator and auxiliary equipment handling during overhaul. |
| International EPC Projects | Customized cranes supplied to overseas power-station construction sites. |
A double-girder overhead crane is commonly used for generator and turbine installation and maintenance because it provides high capacity and full-bay coverage.
Use the heaviest erection or maintenance lift, including lifting beam, hook block and rigging, then verify the required main and auxiliary hook duties.
Provide turbine-hall drawings, capacity, span, lifting height, runway length, power supply, duty, speeds, main/auxiliary hook requirements, installation schedule and destination-country standards.
Send your load data, plant or workshop drawings, lifting sequence, operating environment and control requirements. Henan Mine Crane engineers will review the application and prepare a project-specific crane proposal.