Container Straddle Carrier

For ports, inland terminals and rail yards that need one rubber-tired machine to lift, transport and stack containers without a fixed track system.

Container Straddle Carrier product image

Henan Mine Crane source image for the Container Straddle Carrier, used to illustrate the product category and intended material-handling application.

Container Straddle Carrier for ports and rail yards— lift, transport and stack containers without fixed tracks.

This page is written from a procurement perspective. The accessible source category identifies the product and its target application, but it does not publish one universal capacity, overall dimension, travel speed, turning radius, tire load, gradeability or power system for this exact product. Those items are therefore treated as project-specific rather than invented.

Quick Specifications

Model / Product Family Container Straddle Carrier
Mobility Rubber-tired / straddle-carrier product family
Lifting Capacity Configured according to the complete suspended load
Clear Width / Span Configured around the load and route
Lifting / Under-Clearance Configured around pickup, transport and placement geometry
Travel Speed Project-specific
Turning / Steering Requirement Project-specific according to route geometry
Ground / Pavement Loading Project-specific; final tire / axle loads must be checked
Working Duty Selected from moves per hour, travel distance and load spectrum
Control / Operator Mode Project-specific
Power / Drive System Project-specific
Environment Configured for actual indoor / outdoor site conditions
Best For: For ports, inland terminals and rail yards that need one rubber-tired machine to lift, transport and stack containers without a fixed track system.

Request A Container Straddle Carrier Quote

Product Overview

Container Straddle Carrier for ports and rail yards— lift, transport and stack containers without fixed tracks.

A rubber-tired lifting carrier should be selected as both a crane and a mobile transport system. The lifting arrangement must safely support the load, while the travel system must fit the real route, turning space, ground condition and production cycle. For many projects, route data is as important as capacity.

Before quotation, provide a site layout and the largest load drawing. This allows the supplier to review the load envelope, clear width, lifting height, turning zones, surface capacity and pickup / set-down interfaces together.

Why Choose a Container Straddle Carrier?

Container-Specific Workflow

The source explicitly identifies lifting, transport and stacking of containers.

No Fixed Tracks

This is a source-stated advantage for flexible terminal routing.

Port & Rail-Yard Fit

Both are source-listed operating environments.

Mobile Yard Reconfiguration

Useful where container flows, lanes or block assignments change over time.

Product Images

The current source category exposes one product image for this item. It is shown above as the main image and is not repeated here to avoid duplicate media on the final product page.

Main Equipment Systems

Load-Bearing Gantry / Carrier Structure Configured around the exact product form, load envelope and required clear width.
Hoisting / Lifting System Selected from suspended load, lifting points, lifting height and duty.
Load Attachment / Spreader Project-specific and selected for the actual load geometry and lifting rules.
Rubber-Tired Travel System Configured around loaded travel, route geometry and pavement conditions.
Steering / Maneuvering System Project-specific; selected from turning-space and route requirements.
Brake / Parking System To be specified according to loaded travel, slope, parking and site safety requirements.
Electrical / Hydraulic / Drive System Power architecture is project-specific unless confirmed in the final technical proposal.
Operator / Control System Configured according to visibility, travel route and project operating concept.

Technical Parameters

Product Container Straddle Carrier
Model / Family Container Straddle Carrier
Rated Capacity Project-specific
Clear Width / Span Project-specific
Lifting Height / Under-Clearance Project-specific
Overall Width / Height Project-specific
Travel Speed Project-specific
Turning Radius / Steering Geometry Project-specific
Grade / Slope Requirement Project-specific
Tire / Wheel Load Project-specific
Working Duty Project-specific
Attachment / Spreader Project-specific
Control Mode Project-specific
Power / Drive Project-specific
Outdoor Wind / Corrosion Project-specific where applicable

Source-Confirmed Facts & Buyer-Defined Options

Source-confirmed facts:

  • Product name: Container Straddle Carrier.
  • Category model / family: Container Straddle Carrier.
  • Source application statement: Container Straddle Carrier for ports and rail yards— lift, transport and stack containers without fixed tracks.

Buyer-defined items:

  • Maximum load and load envelope
  • Center of gravity and lifting points
  • Required attachment / spreader
  • Clear width and lifting / under-clearance
  • Travel route and turning space
  • Ground / pavement bearing conditions
  • Moves per hour / shift
  • Steering / control / power concept
  • Outdoor wind / corrosion if applicable
  • Commissioning and operator-training scope

Application Scenarios

Port Terminals Move containers between yard, truck and operating zones.
Rail Yards Transfer containers between rail-side and storage positions.
Inland Terminals Flexible intermodal container handling.
Container Storage Yards Mobile stacking and rehandling without fixed rails.

How to Select the Right Container Straddle Carrier

1. Define Container Sizes

State whether the project handles 20 ft, 40 ft, 45 ft or other container formats.

2. Define Maximum Gross Mass

Use the heaviest loaded container, not tare weight.

3. Define Required Stacking Plan

Rows, tiers and rehandling strategy affect lifting height and clearances.

4. Define Lane Geometry

Provide travel-lane width, turns, truck / rail interfaces and crossing points.

5. Define Throughput

Moves per hour / shift and average travel distance drive productivity requirements.

6. Define Yard Surface

Provide pavement condition, slope, drainage and bearing information.

7. Define Automation Scope if Needed

The source image filename references an automated smart-port application, but the category card itself does not publish a standard automation package; define any automation as project-specific.

Container Handling & Yard Layout Data

Container Format 20 ft / 40 ft / 45 ft / other as required by the buyer.
Maximum Gross Mass Heaviest loaded container.
Stacking Plan Required tiers, rows and rehandling method.
Lane Geometry Travel route, truck / rail interfaces and turning zones.
Throughput Moves per hour / shift and travel distance.
Automation Project-specific; define job dispatch, positioning and fallback requirements if needed.

Rubber-Tired Travel: What Buyers Should Confirm

Travel Route Provide the full loaded route, not only pickup and set-down points.
Minimum Width Measure the tightest aisle, gate, lane or crossing.
Turning Space Show corners, intersections and required reversing / maneuvering zones.
Slope / Cross-Fall Provide route grades where the carrier will travel loaded.
Surface Capacity Provide pavement, slab or ground bearing information.
Surface Condition Identify joints, potholes, rails, drains or transitions that affect tire travel.
Travel Frequency Moves per hour / shift and loaded distance affect duty and maintenance.
Parking Area Define safe parking / maintenance location and any outdoor wind requirement.

Safety & Control: What Buyers Should Confirm

• Rated capacity / overload protection and lifting-attachment weight
• Load stability throughout lift, travel, turning and placement
• Hoisting limits and emergency-stop requirements
• Travel braking, parking and slope-holding requirements
• Steering / maneuvering visibility and operator warning requirements
• Tire condition, wheel / axle load and pavement compatibility
• Anti-collision / obstacle detection if required by the route
• Outdoor wind / parking protection where applicable
• Factory and site load / travel / braking / turning acceptance tests

Installation, Commissioning & Maintenance

Before manufacture, freeze the load drawing, lifting points, route layout, minimum clearances, ground conditions, pickup / set-down positions and operating cycle. Because the equipment is mobile, site acceptance should verify not only lifting but also loaded travel, steering, braking and placement on the actual route.

Maintenance planning should cover the hoisting system, ropes / chains where fitted, attachment, brakes, tires, wheel / axle assemblies, steering components, drive system, structural connections, controls and safety devices. High-frequency applications should define inspection access and spare-part strategy before purchase.

What Information Do We Need for a Quote?

1 Container sizes
2 Maximum container gross mass
3 Required stacking tiers
4 Required clear width / lifting height
5 Truck / rail interface layout
6 Travel-lane width / turning areas
7 Yard route / block layout
8 Average travel distance
9 Target moves per hour / shift
10 Yard pavement / slope information
11 Control / operator preference
12 Automation requirement if any
13 Outdoor wind / corrosion conditions
14 Destination / commissioning scope

Frequently Asked Questions

What determines the correct lifting capacity?

Use the complete suspended load, including the load plus spreader, lifting beam, sling or other permanent attachment.

Why do you need a site route drawing?

A rubber-tired carrier is both a lifting machine and a transport machine. Route width, turning space, slope and pavement can change the required configuration.

Can the dimensions and steering arrangement be customized?

These items are project-specific on the accessible source page. They should be engineered from the actual load and route rather than selected from an assumed standard size.

What affects price most?

Load capacity, clear width, lifting height, route / steering requirements, tire / axle loading, attachment, duty, control / power system and environmental requirements are major design drivers.

What should be tested before acceptance?

The technical agreement should define load lifting, loaded travel, steering, braking, safety functions and any placement / productivity requirements that matter to the project.

Related Rubber-Tired Gantry Products

Building Straddle Carrier
Wind Turbine Straddle Carrier
Steel Mill Straddle Carrier
Precast Concrete Straddle Carrier
Straddle Carrier Crane
A-Frame Rubber-Tired Gantry Crane

Request A Container Straddle Carrier Quote

Send the maximum load, load dimensions, center of gravity, lifting points, required clearances, full travel-route drawing, ground / pavement information and handling frequency. Henan Mine Crane can then review the lifting and mobile-travel requirements together and prepare a project-specific configuration and quotation.