Henan Mine Crane manufactured and dispatched two 1000t gantry cranes for the project. Each crane combines very high lifting capacity with a high-strength steel structure and an intelligent control system designed for stable, safe and efficient operation.
Henan Mine Crane developed and manufactured a 40t rail-mounted portal crane for this application. Its lifting, slewing, luffing and travelling mechanisms allow the operator to approach cargo from different positions, transfer it across the operating area and place it accurately at the selected loading or storage point.
Henan Mine Crane manufactured a 750t double-girder gantry crane for a large industrial project in Zhejiang. The crane operates in a waterfront work area where ultra-heavy components must be lifted, transferred and positioned across a dedicated runway.
Henan Mine Crane manufactured a 100t double-main-girder gantry crane for a China Nuclear Power project. The crane was developed for precise movement and positioning of heavy, high-value equipment during nuclear-industry manufacturing and project support.
Henan Mine Crane supplied more than 30 cranes of different types to a high-end chemical-equipment manufacturer in Shandong. The package
Large river-bridge foundations can use steel caissons that are excavated internally while sinking toward their design elevation. This is not a conventional lifting-only application. The crane system must work around the caisson structure
A large cruise ship is not assembled in one continuous lifting operation. Steel structures, subassemblies, equipment and outfitting materials move through different production zones before final integration
Steel box-girder bridge construction requires long fabricated sections to be lifted and positioned across a wide roadway or river-adjacent working corridor. A conventional workshop crane cannot provide this coverage when the lifting zone extends well beyond a building structure.
Bridge steel fabrication moves large structural sections between welding, machining, inspection and trial-assembly positions. Loads must travel efficiently across the production area, then approach fixtures and mating points at controlled low speed.
Cable-stayed bridge construction requires fabricated steel-tower sections to be lifted, transferred and aligned before final erection. Individual modules can weigh hundreds of tonnes and may have large dimensions