For heavy bulk-material yards that need a double-girder grab gantry with repetitive cycles, automation functions and operator-access / camera monitoring.

Henan Mine Crane mz grab gantry crane showing the primary gantry structure and lifting arrangement.
The MZ grab gantry crane combines a double-main-girder gantry structure with a grab attachment for dedicated bulk-material loading and unloading. The source positions it for heavy repetitive bulk handling in demanding environments.
The source reports 3–5 seconds for a grab opening/closing action and also lists one-button automation, fingerprint authorization and a multi-camera image system. Buyers should define whether these automation and access-control functions are required as contractual scope.
| Product Model | MZ |
| Type-Test Product Name | General Gantry Crane |
| Lifting Capacity | Source-stated where published; otherwise project-specific |
| Span | Source-stated where published; otherwise project-specific |
| Lifting Height | Project-specific unless source-stated |
| Runway / Travel Length | Project-specific |
| Working Duty | Source-stated where published; otherwise selected from actual duty |
| Lifting Attachment | According to the product and load |
| Control Method | Source-supported options + project requirements |
| Operating Environment | According to actual site conditions |
Request A MZ Grab Gantry Crane Quote
Double-main-girder gantry combined with a grab attachment.
Dedicated to heavy bulk-material loading and unloading.
Grab opening/closing can use hydraulic or mechanical transmission.
Any capacity, span, speed, synchronization accuracy, wind limit, temperature limit, throughput or other contractual value that is not explicitly published by the source should be engineered from the actual project and written into the technical agreement.
Purpose-built grab system for loose materials.
3–5 second source-reported opening/closing supports repetitive cycles.
Source supports one-button automation and manual/automatic transition.
Fingerprint control can restrict crane use.
Multi-view video supports operator visibility.
Source highlights operation in demanding environments.
Official source image associated with the grab gantry crane, grab attachment or bulk-material handling application. |
Official source image associated with the grab gantry crane, grab attachment or bulk-material handling application. |
| Gantry Structure | Main girder(s), legs and end structures selected from the exact product layout, load, span and site conditions. |
| Hoisting / Trolley System | Configured around the product's source-described lifting mechanism and operating cycle. |
| Lifting Attachment | Hook, grab, magnet, gantry hook, gate lifting device or construction attachment according to the product. |
| Gantry Travel System | Moves the crane along the fixed ground rail or semi-gantry runway. |
| Electrical & Control System | Configured from source-supported controls and project-specific safety / automation requirements. |
| Model | MZ |
| Product Type | MZ Grab Bucket Gantry Crane |
| Type-Test Product Name | General Gantry Crane |
| Capacity | Project-specific unless source-stated |
| Span | Project-specific unless source-stated |
| Lifting Height | Project-specific unless source-stated |
| Runway Length | Project-specific |
| Hoisting Speed | Project-specific |
| Trolley Travel Speed | Project-specific |
| Gantry Travel Speed | Project-specific |
| Working Duty | Project-specific unless source-stated |
| Control Method | Project-specific |
| Power Supply | According to site electrical conditions |
| Site Environment | According to wind, rain, dust, corrosion and temperature |
Source-confirmed product facts:
Buyer-defined items:
| Coal / Ore Yards | High-cycle bulk transfer. |
| Ports | Bulk loading and unloading. |
| Industrial Stockyards | Repetitive grab handling. |
| Automated Bulk Areas | Where access control and cameras support the operating concept. |
Density, particle size, moisture and abrasiveness drive grab selection.
Tonnes/hour and travel distances determine cycle requirements.
Include grab self-weight in the suspended load.
State which movements are automatic and which remain manual.
Specify required camera coverage and authorized-user procedure.
| Source Grab Response | 3–5 s opening/closing. |
| Automation | One-button start and manual/automatic transition source-listed. |
| Access Control | Fingerprint authorization source-listed. |
| Cameras | Multi-camera real-time monitoring source-listed. |
| Throughput | Project-specific; calculate from full crane cycle. |
Before manufacture, confirm rail center distance, runway length, rail elevation, foundation or building-runway capacity, available lifting height, process clearances, power supply and erection access. Outdoor projects should include wind, rain, temperature, corrosion and anchoring conditions.
Maintenance should follow the final supplied crane manual and actual duty. In addition to hoisting, brakes, ropes, wheels, drives, rails, limits and electrical systems, inspect product-specific devices such as grabs, magnets, gantry hooks, gate equipment, tipping mechanisms, encoders, cameras or automation hardware.
| 1 | Bulk material / loose density |
| 2 | Particle size / moisture / abrasiveness |
| 3 | Required throughput |
| 4 | Grab volume / self-weight |
| 5 | Span / lifting height / runway length |
| 6 | Duty / cycles |
| 7 | Manual / automatic scope |
| 8 | Fingerprint access requirement |
| 9 | Camera coverage requirement |
| 10 | Outdoor / harsh environment |
| 11 | Control method |
| 12 | Yard drawing / destination |
Use the complete suspended load, including the load plus grab, magnet, gantry hook, lifting beam, rigging or any other below-the-hook equipment.
Yes. Unless the source publishes a range, these are project-specific and should be selected from the rail layout and working envelope.
Send a plan and cross-section showing rails, foundations or building runway, loading positions, obstacles, travel length and available clearances.
Where the source supports VFD, PLC, linked operation, cameras, access control or other functions, the final scope should be defined from the buyer's process and acceptance requirements.
Treat them as source product data. If a value is contract-critical for a new project, define the test conditions and acceptance method in the technical agreement.
Send your maximum load, span, lifting height, runway length, site drawing, operating cycle, load geometry, lifting attachment and special control / environment requirements. Henan Mine Crane engineers can then review the actual process and prepare a project-specific configuration and quotation.