For cranes in regular service, inspection programs commonly separate work into daily or pre-shift checks, frequent inspections and periodic inspections. In terminology used by U.S. OSHA 1910.179,
The crane, supporting structure, electrification and erection method form one installation system. A technically correct crane can still arrive late, require expensive rework or become impossible to erect if the building opening