Automated power equipment handling crane above box substations and cable reels
Automated Henan Mine Crane system serving a power-equipment storage yard with box substations and cable reels.
Power-equipment warehouses and production workshops increasingly need cranes that can identify, locate and move valuable equipment automatically rather than relying on repeated manual alignment. Box-type substations, cable reels and electrical materials can vary in size and storage position, so the crane must combine accurate motion, load recognition and warehouse data.
Henan Mine Crane customized two automated cranes for a national power project to handle box-type substation equipment and power cables. The referenced system combines VFD and PLC control, encoder feedback, Gray-bus positioning, 3D scanning, visual inspection, automatic grabbing, obstacle avoidance, anti-sway, WCS scheduling and WMS warehouse management.
In a conventional power warehouse, the crane operator must visually confirm the load, align the hook or lifting attachment and coordinate storage records separately. This becomes inefficient as the number of material locations grows and production requires traceable, repeatable handling.
An automated solution therefore needs more than a motorized crane. The lifting attachment, positioning system, vision sensors, warehouse database, safety logic and central control system must work together as one material-handling platform.
The referenced cranes use a VFD + PLC electrical control system. The hoisting mechanism includes encoder feedback, while bridge and trolley travel use Gray-bus positioning technology for accurate movement.
3D scanning and visual inspection support material recognition, intelligent positioning, automatic pickup and obstacle avoidance. The crane also includes anti-sway functions and an intelligent lifting attachment with detection switches to verify handling conditions.
A dedicated server in the central control room operates the WCS intelligent scheduling system and WMS warehouse-management system, allowing the complete material-handling process to be recorded and managed digitally.
| Recommended Crane | Automated Double-Girder Overhead Crane |
| Referenced Quantity | 2 automated cranes |
| Typical Loads | Box-type substations, power cables and warehouse electrical materials |
| Positioning / Vision | Encoder feedback + Gray-bus positioning + 3D scanning + visual inspection |
| Warehouse Integration | WCS intelligent scheduling + WMS warehouse management |
Central-control screen displaying intelligent crane tasks and material-handling management information. |
Automated overhead crane equipped with a specialized intelligent attachment for electrical-material handling. |
3D scanning and visual inspection help identify the target material and confirm its position before pickup.
Encoder feedback and Gray-bus positioning improve repeatability for bridge, trolley and hoisting movements.
The system can execute automatic pickup while detecting obstacles along the planned handling route.
Load-sway control improves stability during automatic travel and placement.
Crane tasks can be dispatched digitally and linked with warehouse inventory and handling records.
| Power Equipment Warehouses | Automated storage and retrieval of electrical materials and equipment. |
| Substation Manufacturing | Transfer of box-type substations and production components. |
| Cable Storage & Handling | Automatic movement of cable reels and related power materials. |
| Smart Power Workshops | Material handling integrated with digital production and warehouse systems. |
Provide maximum load, load dimensions, lifting-point arrangement, warehouse span and length, lifting height, storage locations, required throughput, positioning accuracy, control modes and WCS/WMS interface requirements.
Yes. The referenced project uses 3D scanning, visual inspection, automatic positioning and an intelligent lifting attachment for automated material handling.
Yes. When connected with WCS/WMS and the project database, handling tasks and material-flow information can be recorded for traceability.
Send your load data, plant or workshop drawings, lifting sequence, operating environment and control requirements. Henan Mine Crane engineers will review the application and prepare a project-specific crane proposal.