For modern yards that need two trolley systems with independent or joint operation, efficient integrated drives and operator positioning guidance.

Henan Mine Crane me new-type double-trolley gantry crane showing the primary gantry structure and lifting arrangement.
The ME new-type double-trolley gantry crane is a general rail-mounted gantry crane with two trolleys. The source lists working class A3–A8 and states that the two trolleys can be used independently or in combined operation.
The source confirms encoder and CI-card inverter technology for double-trolley control, three-in-one direct drives for trolley and gantry travel, and an optional crane projection light to warn operators or guide load positioning.
| Product Model | ME |
| Type-Test Product Name | General Gantry Crane |
| Lifting Capacity | Source-stated where published; otherwise project-specific |
| Span | Source-stated where published; otherwise project-specific |
| Lifting Height | Project-specific unless source-stated |
| Runway / Travel Length | Project-specific |
| Working Duty | Source-stated where published; otherwise selected from actual duty |
| Lifting Attachment | According to the product and load |
| Control Method | Source-supported options + project requirements |
| Operating Environment | According to actual site conditions |
Request A ME New-Type Double-Trolley Gantry Crane Quote
Source working class A3–A8.
Trolley and gantry travel mechanisms use three-in-one direct drives.
Double-trolley control uses encoder and CI-card inverter technology.
Any capacity, span, speed, synchronization accuracy, wind limit, temperature limit, throughput or other contractual value that is not explicitly published by the source should be engineered from the actual project and written into the technical agreement.
Source explicitly supports separate and combined operation.
Supports more structured two-trolley control.
Integrated travel drives reduce transmission interfaces.
Can help operators align the load or define a warning area.
Broad duty range supports project-specific selection.
Official source image associated with the double-trolley gantry crane or industrial application. |
Official source image associated with the double-trolley gantry crane or industrial application. |
Official source image associated with the double-trolley gantry crane or industrial application. |
Official source image associated with the double-trolley gantry crane or industrial application. |
Official source image associated with the double-trolley gantry crane or industrial application. |
Official source image associated with the double-trolley gantry crane or industrial application. |
| Gantry Structure | Main girder(s), legs and end structures selected from the exact product layout, load, span and site conditions. |
| Hoisting / Trolley System | Configured around the product's source-described lifting mechanism and operating cycle. |
| Lifting Attachment | Hook, grab, magnet, gantry hook, gate lifting device or construction attachment according to the product. |
| Gantry Travel System | Moves the crane along the fixed ground rail or semi-gantry runway. |
| Electrical & Control System | Configured from source-supported controls and project-specific safety / automation requirements. |
| Model | ME |
| Product Type | ME New-Type Double-Trolley Gantry Crane |
| Type-Test Product Name | General Gantry Crane |
| Capacity | Project-specific unless source-stated |
| Span | Project-specific unless source-stated |
| Lifting Height | Project-specific unless source-stated |
| Runway Length | Project-specific |
| Hoisting Speed | Project-specific |
| Trolley Travel Speed | Project-specific |
| Gantry Travel Speed | Project-specific |
| Working Duty | Project-specific unless source-stated |
| Control Method | Project-specific |
| Power Supply | According to site electrical conditions |
| Site Environment | According to wind, rain, dust, corrosion and temperature |
Source-confirmed product facts:
Buyer-defined items:
| Long Components | Two-point lifting when configured for the load. |
| Steel / Fabrication Yards | Independent or joint trolley handling. |
| Assembly Areas | Operator guidance for positioning. |
| General Heavy Yards | Flexible multi-trolley rail-mounted handling. |
Center of gravity may create unequal trolley loads.
Required for long or large loads.
State allowable height difference / tilt for joint operation.
Specify warning or positioning purpose and required reference location.
Use real cycles / load spectrum.
| Independent Operation | Source-confirmed. |
| Joint Operation | Source-confirmed. |
| Control Technology | Encoder + CI-card inverter source-confirmed. |
| Synchronization Tolerance | Buyer-defined; source does not publish a universal numerical value. |
| Projection Light | Optional source-confirmed operator guidance / warning function. |
Before manufacture, confirm rail center distance, runway length, rail elevation, foundation or building-runway capacity, available lifting height, process clearances, power supply and erection access. Outdoor projects should include wind, rain, temperature, corrosion and anchoring conditions.
Maintenance should follow the final supplied crane manual and actual duty. In addition to hoisting, brakes, ropes, wheels, drives, rails, limits and electrical systems, inspect product-specific devices such as grabs, magnets, gantry hooks, gate equipment, tipping mechanisms, encoders, cameras or automation hardware.
| 1 | Total maximum load |
| 2 | Maximum load per trolley |
| 3 | Load dimensions / center of gravity |
| 4 | Lifting-point spacing |
| 5 | Synchronization / allowable tilt |
| 6 | Span / lifting height / runway length |
| 7 | A3–A8 duty inputs |
| 8 | Projection-light requirement |
| 9 | Control method |
| 10 | Outdoor conditions |
| 11 | Rail/foundation drawing |
| 12 | Destination |
Use the complete suspended load, including the load plus grab, magnet, gantry hook, lifting beam, rigging or any other below-the-hook equipment.
Yes. Unless the source publishes a range, these are project-specific and should be selected from the rail layout and working envelope.
Send a plan and cross-section showing rails, foundations or building runway, loading positions, obstacles, travel length and available clearances.
Where the source supports VFD, PLC, linked operation, cameras, access control or other functions, the final scope should be defined from the buyer's process and acceptance requirements.
Treat them as source product data. If a value is contract-critical for a new project, define the test conditions and acceptance method in the technical agreement.
Send your maximum load, span, lifting height, runway length, site drawing, operating cycle, load geometry, lifting attachment and special control / environment requirements. Henan Mine Crane engineers can then review the actual process and prepare a project-specific configuration and quotation.