Henan Mine Crane engineered and manufactured a 550t double-girder overhead crane specifically for a nuclear power application. The crane was dispatched in April 2025 with an intelligent control package designed to combine large lifting capacity with smooth movement and efficient energy use.
A national pumped-storage power project required a coordinated crane package for major generating-equipment installation, auxiliary handling and long-term powerhouse maintenance. The underground cavern created strict limits on crane height, installation access and maintenance clearance.
A wind turbine manufacturing base required a group of overhead cranes for mainframe production, nacelle assembly, component transfer, tooling changes and maintenance. Lifting loads varied significantly by workstation, from very heavy main structures to medium-capacity assemblies and production-support tasks.
A thermal power project in Morowali, Central Sulawesi required high-capacity turbine-hall cranes for the erection of three 380 MW supercritical, once-reheat condensing coal-fired generating units. The cranes needed to handle major equipment safely during plant construction and remain available for inspection and maintenance after commissioning.
This offshore wind manufacturing project required a heavy lifting system for large nacelles, generators, mainframes, production fixtures and other high-value wind turbine components. The components move through unloading, assembly, turning, transfer and installation processes inside a large production workshop.
Henan Mine Crane supplied multiple bridge cranes, including 125t units, for a major national water-conservancy project. The cranes are installed inside an underground pump-station cavern and support the installation, alignment and long-term maintenance of heavy pump and motor units.
At a major offshore wind-turbine assembly base, dozens of Henan Mine Crane units support heavy component handling across production, assembly and maintenance areas. The installed fleet includes a 260/260+100/20t-marked heavy-duty overhead crane configuration for large synchronized lifts.
Henan Mine Crane developed a carbon block stacking crane for a new carbon-material baking-furnace project in Shandong. The project crane uses a box-type double-girder structure, one trolley and two specialized lifting devices.
Henan Mine Crane developed a fully automatic clean explosion-proof crane for a polysilicon producer in Jiangsu. The production room requires air cleanliness Class 4 under the project classification, corresponding to national-standard Class 7, and contains flammable and explosive gases.
Henan Mine Crane manufactured 18 high-precision cranes customized for CRRC’s clean-energy equipment manufacturing base. The associated project is planned around a combined wind and solar installed capacity of 5 million kW.