Metro depots need reliable cranes for bogies, motors, wheelsets, maintenance tools and other vehicle-service loads. A fleet project should cover inspection bays, maintenance workshops and parking facilities while standardizing spare parts and operating methods.
Henan Mine Crane supplied 32 crane sets of different types for the Lahore Orange Line Metro project in Pakistan. The source states that the cranes were installed in the depot and parking yard and are mainly used for vehicle inspection, maintenance and commissioning.
The Lahore Orange Line is a 27 km urban rail project with 26 stations. After line opening, depot cranes become long-term maintenance assets rather than temporary construction equipment.
Procurement should therefore focus on maintenance load cases, hook approach around rail vehicles, lifting height, workshop span, duty cycle, control mode, spare parts and safe access for long-term servicing.
The referenced project uses 32 crane sets distributed across the vehicle depot and parking facilities. The cranes support train inspection, maintenance and commissioning during line operation.
For a new metro depot, Henan Mine Crane can build a crane schedule by maintenance bay, identifying the heaviest component and required hook position for each workstation.
Common control components, brakes, motors and documentation can be standardized across the fleet while crane capacity and lifting arrangement remain specific to each bay.
| Recommended Solution | Metro Depot Overhead Crane & Maintenance Crane Fleet |
| Referenced Quantity | 32 crane sets |
| Application | Vehicle depot + parking yard |
| Main Duty | Rail-vehicle inspection, maintenance and commissioning |
| Fleet Strategy | Standardized controls/components with bay-specific crane capacity |
Source project image showing the rail vehicle and project team associated with the metro line. |
Multiple workshop bridge cranes installed for rail-vehicle maintenance and commissioning. |
Long maintenance bay equipped with overhead cranes for depot service operations. |
Several bridge cranes installed in parallel across the rail maintenance workshop. |
Source project reference image showing a heavy workshop crane in a Pakistan industrial facility. |
Additional Pakistan infrastructure reference image included in the original Lahore Orange Line article. |
Additional source image documenting Henan Mine Crane project activity in Pakistan. |
Source image of the Lahore Orange Line Metro opening ceremony included with the crane project article. |
A multi-crane package supports several maintenance and inspection areas.
Cranes can be assigned to bogies, motors, wheelsets, tooling and workshop equipment according to the bay.
Overhead crane layouts provide clear floor space around rails and maintenance pits.
Common components simplify long-term maintenance and spare-parts planning.
Documentation, shipment and commissioning can be coordinated for overseas rail projects.
| Metro Depots | Train inspection, repair and overhaul lifting. |
| Rail Vehicle Workshops | Handling bogies, motors and heavy maintenance components. |
| Parking & Stabling Yards | Auxiliary maintenance and service lifting. |
| Urban Rail Operations | Long-term lifting support after project opening. |
The source states that 32 crane sets of different types were supplied for operation and maintenance.
The referenced project uses them mainly for vehicle inspection, maintenance and commissioning in the depot and parking yard.
Provide workshop layout, rail and pit positions, maximum maintenance loads, span, lifting height, hook approach, duty, control mode, power supply and required crane quantity.