Workshops where hook vertical service space is important and the application involves small to medium loads with intermittent, repetitive handling.

Henan Mine Crane ldp offset single girder crane product image showing the crane structure and lifting arrangement.
Choose the LDP offset single-girder crane when your workshop needs more usable hook height but the load and duty do not justify a heavier double-girder crane. The key purchasing question is whether the side-mounted hoist arrangement solves your vertical clearance problem without increasing building loads unnecessarily.
The crane provides vertical lifting, cross travel and long travel for general workshop material handling. Capacity, span, lifting height, duty, control method and exact hook approach should be confirmed from the workshop drawing and load data.
| Product Model | LDP |
| Type-Test Product Name | Electric Single Girder Crane |
| Lifting Mechanism | Fixed electric hoist arranged on one side of the main girder |
| Lifting Capacity | Configured according to project requirements |
| Span | Configured according to runway center distance |
| Lifting Height | Configured according to workshop requirements |
| Working Duty | Source-defined where stated; otherwise project-specific |
| Control Method | Configured according to project requirements |
Request A LDP Offset Single Girder Crane Quote
The LDP crane is an improved design based on the electric single-girder crane.
The lifting mechanism is a fixed electric hoist arranged on one side of the main girder.
The side-mounted hoist increases the hook's available vertical working space compared with a traditional single-girder layout.
For a new procurement project, the final configuration should be selected from the actual suspended load, span, lifting height, runway condition, operating cycle, working environment and applicable project requirements. Parameters not published on the source page are therefore treated as project-specific rather than guessed.
The hoist is arranged to one side of the main girder, increasing the vertical service space available to the hook compared with a conventional single-girder arrangement.
A simple, lightweight structure reduces crane self-weight and can lower the demand placed on the runway and workshop structure.
The source positions this design for small and medium load handling rather than ultra-heavy process duty.
The source describes its trolley-style design as providing better stability and safety than a traditional single-girder crane.
It can be a practical choice when the buyer needs additional hook clearance without moving to a heavier crane architecture.
Henan Mine Crane ldp offset single girder crane product image showing the crane structure and lifting arrangement. |
Henan Mine Crane ldp offset single girder crane product image showing the crane structure and lifting arrangement. |
| Main Girder | Single load-bearing bridge girder spanning the crane runway. |
| Side-Mounted Fixed Electric Hoist | The lifting mechanism is arranged on one side of the main girder to improve usable vertical hook space. |
| Cross-Travel Arrangement | Provides transverse movement across the workshop bay. |
| End Carriages / Long Travel | Moves the crane along the runway to cover the workshop length. |
| Electrical & Control System | Configured according to site power, control preference and operating requirements. |
| Model | LDP |
| Product Type | LDP Offset Electric Single Girder Overhead Crane |
| Lifting Mechanism | Fixed electric hoist arranged on one side of the main girder |
| Capacity | Project-specific |
| Span | Project-specific |
| Lifting Height | Project-specific |
| Hoisting Speed | Project-specific |
| Travel Speed | Project-specific |
| Control Method | Project-specific |
| Power Supply | According to site electrical conditions |
| Working Environment | Confirm from actual project conditions |
Source-confirmed product facts:
Buyer-defined items for quotation:
| Machinery Workshops | Handling components, fixtures, tooling and maintenance loads. |
| Low-Clearance Production Bays | Projects where usable hook height is restricted by the building. |
| Small / Medium Load Assembly | Intermittent and repetitive lifting across assembly stations. |
| Workshop Renovation | Projects where reducing structural demand is important. |
Provide the roof, runway and equipment elevations. The LDP is valuable only when the side-mounted hoist creates meaningful extra hook working space in your actual building.
Include the lifted item, rigging, lifting beam and any permanent below-the-hook device.
Use the runway center-to-center distance, not the clear building width.
Provide lifting frequency, typical load percentage and daily working hours to verify whether this single-girder solution is appropriate.
For retrofit projects, provide runway beam and column information so crane self-weight and wheel loads can be reviewed.
Before installation, confirm runway span, rail or runway-beam condition, elevation, straightness, power supply, access for erection and the lifting plan for the crane structure. Retrofit projects should also provide available building and runway information for structural review.
Maintenance requirements should follow the final supplied configuration and manual. Routine work normally includes inspection of the lifting mechanism, brakes, rope or chain where applicable, wheels, drives, fasteners, limits and electrical protection, with lubrication and replacement intervals defined by the actual product configuration and duty.
| 1 | Maximum lifted load including rigging |
| 2 | Runway center-to-center span |
| 3 | Required lifting height |
| 4 | Available headroom above runway |
| 5 | Runway length |
| 6 | Workshop drawing |
| 7 | Lifts per hour / daily working hours |
| 8 | Control method |
| 9 | Power supply |
| 10 | Destination and installation scope |
Choose LDP when the side-mounted hoist arrangement gives you valuable additional vertical hook working space. If headroom is not a constraint, a standard LD crane may be simpler.
The source positions it for small to medium loads. Heavy-duty requirements should be evaluated separately and may justify a double-girder solution.
The workshop cross-section is especially important because the value of the LDP design depends on available headroom and required hook height.
The source page does not publish fixed capacity or span ranges, so these should be selected from your project data.
| LD Electric Single Girder Overhead Crane |
| LDP Offset Single Girder Overhead Crane |
| LDC European Single Girder Overhead Crane |
| LB Explosion-Proof Single Girder Crane |
| LDZ Grab Bucket Single Girder Crane |
| Low Headroom Single Girder Overhead Crane |
| LDY Metallurgical Single Girder Overhead Crane |
Send your lifting capacity, span, lifting height, workshop drawing, load information, working environment and operating requirements. Henan Mine Crane engineers will review whether this product type is appropriate and prepare a project-specific configuration and quotation.