For long or complex loads that need two independent trolleys, synchronized tandem lifting or controlled balanced turning.

Henan Mine Crane kssle double-trolley hoist crane product image showing the crane and lifting arrangement.
The KSSLE new-type double-trolley electric-hoist bridge crane uses two independent new-type hoist trolleys on the same crane runway. The source states that they can work independently or in coordinated operation.
The main buyer value is process flexibility: each trolley can handle different loads independently, while synchronized control can be used for accurate tandem lifting of long materials and balanced turning. The crane also uses dual-speed hoisting and VFD travel.
| Product Model | KSSLE |
| Type-Test Product Name | Electric Hoist Bridge Crane |
| Lifting Mechanism | Two new-type electric-hoist trolleys |
| Lifting Capacity | Configured according to project requirements |
| Span | Configured according to runway center distance |
| Lifting Height | Configured according to workshop / process requirements |
| Working Duty | Selected from load spectrum and operating frequency |
| Control Method | Configured according to project requirements |
Request A KSSLE Double-Trolley Hoist Crane Quote
Uses new-type electric hoists with dual-speed lifting and variable-frequency travel.
Two independent trolleys operate on the same rail.
Trolleys can operate independently or cooperatively.
For a new purchase, any capacity, span, speed, duty or positioning value that is not published on the source page should be confirmed from the actual project rather than assumed from a similar crane.
Each trolley can handle separate loads or work with the other trolley.
Synchronized control supports accurate two-point lifting of long materials.
The source explicitly states balanced turning can be performed through synchronized control.
Combines productivity with controlled positioning.
C-shaped arrangement reduces headroom and end approach.
Source product image showing another view of the KSSLE Double-Trolley Hoist Crane structure and hoisting system. |
Source product image showing another view of the KSSLE Double-Trolley Hoist Crane structure and hoisting system. |
Source gallery image associated with the KSSLE Double-Trolley Hoist Crane product page, showing an installation or application reference. |
Source gallery image associated with the KSSLE Double-Trolley Hoist Crane product page, showing an installation or application reference. |
Source gallery image associated with the KSSLE Double-Trolley Hoist Crane product page, showing an installation or application reference. |
Source gallery image associated with the KSSLE Double-Trolley Hoist Crane product page, showing an installation or application reference. |
| Bridge Structure | Modular lightweight overhead bridge. |
| Two New-Type Hoist Trolleys | Independent trolleys sharing the same rail. |
| Synchronization Control | Supports tandem lifting and balanced turning. |
| Dual-Speed Hoists | Fast lift plus low-speed positioning. |
| VFD / Optional IoT Controls | Smooth travel with optional monitoring expansion. |
| Model | KSSLE |
| Product Type | KSSLE New-Type Double-Trolley Electric Hoist Bridge Crane |
| Type-Test Product Name | Electric Hoist Bridge Crane |
| Lifting Mechanism | Two new-type electric-hoist trolleys |
| Capacity | Project-specific |
| Span | Project-specific |
| Lifting Height | Project-specific |
| Hoisting Speed | Project-specific unless explicitly stated in source |
| Trolley / Crane Travel Speed | Project-specific |
| Working Duty | Project-specific |
| Control Method | Project-specific |
| Power Supply | According to site electrical conditions |
| Installation / Building Interface | According to workshop, runway and crane configuration |
Source-confirmed product facts:
Buyer-defined items for quotation:
| Long Materials | Two-point lifting of beams, long equipment and fabricated sections. |
| Load Turning | Balanced turning where the process needs controlled orientation change. |
| Assembly Operations | Synchronized placement of long or complex components. |
| Flexible Manufacturing | Two trolleys also serve independent lifting tasks. |
Provide length, weight, center of gravity and whether the load must be turned.
Trolley spacing and travel range depend on the actual pick points.
State acceptable hook-height difference and rotation-control requirements.
Specify maximum load for each trolley when used separately.
Complete the standard crane parameters and building interface.
Before manufacture and installation, confirm runway span, rail or runway-beam condition, elevation, straightness, available headroom, electrical supply and erection access. Multi-trolley, suspended or cross-rail systems also require the relevant trolley spacing, support-point or transfer-interface data to be checked before production.
Maintenance should follow the final supplied crane manual and include the hoists, brakes, ropes, hooks / attachments, wheels, drives, fasteners, limits and electrical protection. Synchronized and multi-trolley systems should also include periodic verification of encoders, control logic and relative lifting position where applicable.
| 1 | Total maximum load |
| 2 | Maximum load per trolley |
| 3 | Load length / width / center of gravity |
| 4 | Lifting-point spacing |
| 5 | Balanced turning requirement |
| 6 | Synchronization / allowable tilt |
| 7 | Span |
| 8 | Lifting height |
| 9 | Runway length |
| 10 | Available headroom |
| 11 | Operating frequency |
| 12 | Control / monitoring requirements |
| 13 | Workshop drawing |
| 14 | Power supply and destination |
Yes. The source explicitly states independent and coordinated operation.
Yes. The source states synchronized control can support balanced turning of long materials.
Provide load dimensions, center of gravity, lifting points, desired rotation and allowable tilt.
Yes. Both are explicitly stated for the new-type double-trolley crane.
Yes. The source states remote monitoring and intelligent maintenance can be expanded.
Send your lifting load, span, lifting height, runway length, workshop drawing, operating cycle and any special lifting, synchronization, positioning or safety requirements. Henan Mine Crane engineers will review the application and prepare a project-specific crane configuration and quotation.